We built the world's first modular light steel plateau
It is the world's first film settee built with a light steel structure system. 99 different types with a closed construction area of 52,000 m2; The prototype of the city was created, consisting of 13th century buildings such as palaces, inns, baths, churches, mosques, dervish lodges, libraries, soup kitchens, residences and city walls. Plateau; It was completed in a period of 6 months, working together with 12 architects, engineers, technical personnel, 8 sculptors and a team of 200 journeymen-masters-workers-carpenters. During the construction of the Plato, 625,000 kg of steel, 37,000 m2 of polyester facade, 14,200 m2 of osb, 11,500 m2 of plasterboard, 5,600 m2 of fibercement, 3,800 m2 of membrane and in addition to all these manufacturing, thousands of motifs / facade decorations reflecting the period were produced and applied.