Turkey's largest urban transformation project
We completed the Fikirtepe urban transformation sales office, which consists of 4 floors with a construction area of 4800 square meters and steel construction was preferred as the construction method, in a short time of 154 days. 460 tons of steel were used in this structure, which is Turkey's largest urban transformation project, which will first become a liaison office and then a youth center. These 154 days, 21 of which were snowy and rainy, include the preparation of the application project, material selection and design for finishing works.